Completed Project: Power Station Monitoring Wells
Project Summary:
Objective:
- Monitoring wells at a power station
Problems:
- Overhead restrictions
- Aggressive water
- Time and sunstroke!
Solution:
- Boreline® flexible drop pipe
Introduction:
This new Power Station is being built far from away from any Cities. It is in the middle of a desert where temperatures can soar to 120°F (49°C).
Boreline® was chosen for a number of reasons:
- Firstly, there are overhead power cables that restrict access to the monitoring well. A crane cannot get close to these cables so installing the Boreline® was ideal as this is done horizontally.
- Secondly, it is quick and easy to install Boreline® thereby saving valuable time and manpower. Transporting the Boreline® to site is also a major advantage.